CSR UPDATE | Today, 11 August 2021, the ZAMCELCO through CMO Marvee M. Espejo, turnover Ten (10) Bags of Cement to Culianan National High School in support of the Brigada Eskwela 2021 kick-off.
NOW HAPPENING | Replacement of inclined and rotten secondary wooden pole at Cherry Dr., Tumaga. Please bear with us, as we conduct this replacement of inclined and rotten secondary wooden pole in order to provide better services and long term stable power supply to all our valued MCOs. The restoration of power will resume immediately […]
The New ZAMCELCO joins the nation in its celebration of the 11th National Electrification Awareness Month, with the theme: “Changing for the Future: Moving for a Resilient Rural Electrification (RE) Program” through the conduct of the institutional Tree-Planting Activity headed by GM Gannymede B. Tiu, together with by the Board of Directors, Investor Managers, members […]
The Power Supply Procurement Plan (PSPP) is a strategic document mandated by the Department of Energy (DOE) and the National Electrification Administration (NEA) that requires distribution utilities to outline their plans for securing adequate, reliable, and cost-effective electricity supply for their service areas. The PSPP aims to ensure that utilities meet current and future demand […]