Please be advised that there will be a power interruption. Affected Feeder: Pasonanca Time: 8:30 AM to 3:00 PM Duration: 6.5 hours Reason: Installation of 3-phase line recloser under Pasonanca near Summerhill, replacement of burned/broken 3-phase backbone pole at entrance Lantawan and Roght-of-Way (ROW) clearing along Pasonanca Feeder. Please bear with us. The restoration of […]
Please be advised that there will be a power interruption. Affected Feeders: Putik (M1), Sangali (M3) Time: 6:00 AM to 6:00 PM Duration: 12 hours Reason: Rehabilitation of structures along the line and contingency measure to prevent undervoltage condition at District 1 AOR during the shutdown of Aurora-NagaMin 138kV Transmission Line 2. Please bear with […]